
SEPTEMBER 28, 2015 LAST UPDATED: MONDAY, SEPTEMBER 28, 2015, 1:30 PM
BY BY MARK KRULISH
STAFF WRITER |
THE RIDGEWOOD NEWS
The eighth Central Business District forum was held on Wednesday night with an emphasis on parking and concepts for a potential garage to be built at the Hudson Street lot.
The Village Council recently selected Desman Design Management to design a multi-level parking deck and present architectural renderings for a public review by residents and the governing body.
Desman will be working with S&L Architectural studio, which Desman Executive Vice President Tim Tracy said would help develop the “bones” of the garage, along with the aesthetics. Desman will also be working with Maser Consulting to assist with the site engineering and traffic studies. Tracy said Maser has previously been engaged with the village and is familiar with traffic flow and patterns.
Ideally, Tracy said, the new garage would bring a net increase of at least 300 spaces, giving the deck approximately 350-400 spaces in its final configuration.
The width of the Hudson Street lot is not ideal for a parking garage lot, but Desman is looking at other opportunities to “borrow” from existing infrastructure, such as building a cantilever over the sidewalk, to expand the footprint of the site. Although such a proposal could mean losing the on-street parking available on Hudson Street, it could potentially bump the total number of parking spots available even higher.
“We have a site that is somewhat geometrically challenged,” said Tracy. “We have properties adjoining three sides of this property and we need to respect those properties. Some of those properties rely on this current parking lot for access and egress and service vehicles. All of that will be considered.”
Engineer document poor site will tower over the sidewalks. Sucking Light and Air from the block all across from an historic Church Landmark architecture. This Garage needs to be Resited