PSE&G ELECTRIC RELIABILITY IMPROVEMENTS 69KV UTILITY INFRASTRUCTURE UPGRADE WORK SCHEDULE

unnamed-7

file photo Boyd Loving

PSE&G ELECTRIC RELIABILITY IMPROVEMENTS 69KV UTILITY INFRASTRUCTURE UPGRADE
WORK SCHEDULE

UPDATE: FEBRUARY – MARCH 2014 VILLAGE OF RIDGEWOOD

As part of our electric reliability improvements in Bergen County, PSE&G will be performing utility pole line work in the Village of Ridgewood. As of early February through March 2014, PSE&G will be performing the following activities in your area:

Feb. 1 – Feb. 7
Wire Work & Limited Pole Sets
E. Ridgewood Avenue
(N. Van Dien Avenue to Paramus Road)
Limited Lane or Road Closure

Feb. 8 (8am – 8pm)**
Wire Work & Pole Set
E. Ridgewood Avenue (Intersection of Walthery Avenue)
Full Road Closure (Follow Detour)

Feb. 9 – Mar. 16
Wire Work & Limited Pole Sets
E. Ridgewood Avenue
(N. Van Dien Avenue to Paramus Road)
Limited Lane or Road Closure

Mar. 1 – Mar. 28
Wire Work
E. Ridgewood Avenue (Hope Street to Paramus Road)
Limited Lane or Road Closure

Mar. 1 – Mar. 28
Fiber Optic Pull
S. Maple Avenue – Spring Avenue – S. Irving Street – E. Ridgewood Avenue
Limited Lane or Road Closure

Excluding inclement weather delays or as otherwise noted above(**), PSE&G anticipates working Monday – Friday (9am – 5pm), as well as Saturday and Sunday (8am – 5pm) on an as needed basis, in order to complete our work as quickly as possible.

PSE&G will work closely with the Village of Ridgewood Police Department to minimize traffic impacts. All work will be performed in accordance with PSE&G safety and environmental standards and no interruption of electric service is anticipated.

Upon project completion, these upgrades will increase both electric service capacity and system redundancy to ensure safe and more reliable electric service to our customers. Questions about this project can be directed to PSE&G’s Electric Utility Upgrade contact number: 1-800-901-5035.

https://mods.ridgewoodnj.net/pdf/manager/20140205PSEGNot.pdf

Save 15% on Valentine's Day Flowers & Gifts at 1800flowers.com. Use Promo Code: VDAY2014 at checkout (Offer Ends 02/13/14)show?id=mjvuF8ceKoQ&bids=216823

2 thoughts on “PSE&G ELECTRIC RELIABILITY IMPROVEMENTS 69KV UTILITY INFRASTRUCTURE UPGRADE WORK SCHEDULE

  1. They still don’t fix streetlights. They were notified over a week ago and its still dark and they’re still billing the town for it!

  2. If you go to the village website and select Departments and Services and then Village Manager you get the schedule too.

    Apparently our village is run by PSEG

    https://mods.ridgewoodnj.net/pdf/manager/20140205PSEGNot.pdf

Leave a Reply

Your email address will not be published. Required fields are marked *