photos by Derek Michalski
“If anything Toll Brothers removing 1000+ trees, replacing with new ones and bringing fresh clean top soil – in turn cleaning up 100+ acres is actually a good thing. Why doesn’t anyone blame the building departments – where is the frustration and anger in the incompetence from these town building departments? Toll Brothers is following their requests – building department should have been proactive and requested more from the beginning of the project to reduce the likely hood of run-off from future storms. As for home value some residents are complaining in the reduction of home value – however they are building luxury homes and should in fact bring the area up in value.”

Because building department and engineers have to few skilled resources to keep up with the development that is being allowed. They are being asked to be an engineer, a traffic safety guru, a developer and building expert.
No. The ENGINEER is expected to be an engineer. The boroughs have gore Boswell engineering. Boswell, the NJDEP and NJ LSRP are all complicit in allowing the simultaneous deforestation of 100 acres; leaving a veritable desert, ripe for the erosion that ensued since the winter of 2017. People HAVE been complaining to all these entities, only to be ignored or told they have done everything within their power to control what is an uncontrolled situation. They have lied on multiple occasions to many different people…all of them. And they’ve refused to accept what has been proven: arsenic is being dumped…because to accept that would shine a light on their own mistake, in having allowed the entire property to have been “remediated” all at once. The Borough of USR has tried to pass the buck by stating that NJ DEP allowed that…but Boswell, and de facto the the town, had the authority to intervene. THE FAILURE IS ON ALL LEVELS. And Toll Brothers has done nothing that it wasn’t directed to do by the authorities. This is all at the feet of the regulators.