
the staff of the Ridgewood blog
Mahwah NJ, Route 202 TRAFFIC ALERT from Mahwah Police – As part of the upgrades to the old Carmel Retreat – there will be the installation of a water main from the area of Farmstead Road down Rt. 202 (south) to the HMH Carrier Clinic (1071 Ramapo Valley Road, formerly Carmel Retreat). The current plan is to start the project on Monday (7/25/22) with officers that day alternating traffic. On Tuesday, (7/26/22) we will have Rt. 202 south closed at Darlington Ave for people wishing to travel to Oakland NJ. The detour will be as follows: Left turn onto Darlington Ave., bear Right to Campgaw Road, Right turn onto Pulis Ave., Right turn onto Franklin Ave., a Left turn onto Colonial Road and ultimately leading vehicles to a Right turn onto Franklin Lakes Road which turns into Long Hill Road and back to Rt. 202.
Total Return 120% of Principal plus 50% Profits plus 50% in Equity
Check it out :The True Tale of Thomas Giacomaro: Con Man, Mob Guy, Fugitive, FBI Informant
https://wefunder.com/the.kingof.con.docuseries.2022
How to invest on #EquityCrowdfunding Site #Wefunder https://youtu.be/BHhBnzoCZRQ
During the first two weeks we plan on allowing northbound traffic to continue into Mahwah and will be directed by police in the construction area. Local residents traveling south to their homes in Mahwah will reach Seminary Dr. and an officer will be there to assist in halting northbound traffic allowing the resident with some delay to travel home.
The time of operation for the month of July and August will be 8am-5pm, Monday thru Friday.