
HUDSON STREET LOT CLOSED FOR TESTING – SUNDAY, JUNE 7TH
To learn more about the ground conditions at the Hudson Street Lot the Village will be doing some testing. This is in preparation for the potential construction of a new parking facility. The testing will take place this Sunday, June 7th.
A consultant working for the Village will be performing ground penetrating radar (gpr) survey of the Hudson Street parking lot. To do this survey the lot needs to be free of cars to be effective.
The Hudson Street Lot will be closed at midnight Saturday, June 6 with several barricades to deny access. The lot will be reopened at 2:00 pm on Sunday, June 7. No cars will be permitted to park in the lot during that time period. Vehicle access to the rear of the properties on East Ridgewood Avenue through the lot will be maintained. Emergency access through the lot will be maintained.
The gpr equipment is small, makes no noise and does not take up much room.
Please share this information on the short term closing of this lot with friends and neighbors.