Posted on

Pascack Road Resurfacing Project: Paving Schedule

IMG 20230919 132616452 MP scaled

the staff of the Ridgewood blog

Twp. of Washington NJ, the Pascack Road resurfacing project has reached the final day of paving. Please take the time to read the information below on the projected road closures.

7:00am – 8:30am – Pascack Road will be closed between Manhattan Avenue and Ridgewood Road.  Ridgewood Road will be open during this time period to access the Westwood High School for morning drop-off.

8:30am – 10:00am – Pascack Road will remain closed and Ridgewood Road will also be closed between Woodfield Road and Ridgewood Blvd. North. This closure will allow for the paving of the intersection of Pascack Road and Ridgewood Road.

10:00am – 1:00pm – Ridgewood Road will be reopened. Pascack Road will now be closed between Ridgewood Road and Soldier Hill Road. Residents on / off of Pascack Road between Ridgewood Road and the Knights of Columbus will need to have their vehicles removed from their homes if they wish to travel during this time period.

1:00pm – 5:00pm – Pascack Road closures remain in place, residents on / off of Pascack Road between the Knights of Columbus and Linwood Avenue will need to have their vehicles removed from their homes if they wish to travel during this time period. This includes residents from Hampton Court and Washington Pond.

Leave a Reply

Your email address will not be published. Required fields are marked *