the staff of the Ridgewood blog
Ridgewood NJ, The solar panels were approved by the Board of Education in 2015, and were supposed to be erected last summer, but were pushed back for various reason to this summer.
According to the Ridgewood Board of Education ,Eight Ridgewood schools have been receiving a portion of their electricity from solar power since late 2012/early 2013 ; • Ridgewood High • BF Middle • Glen • Hawes • Orchard • Ridge • Somerville • Travell •
Total installed solar capacity of 841 kW • 2014 solar energy production of ~875,000 kWh • 2014 savings from using solar energy ~$70,000
BF Middle School will add • 329.4 kW Carport Mounted System • $0.125/kWh year 1 PPA Price with a 3% Escalator • Year 1 Savings ~$18,000 • 15-Year Savings Potential >$275,000
Information was pulled from March 25,2015 presentation from Verterra :https://www.ridgewood.k12.nj.us/modules/groups/homepagefiles/cms/923620/File/solar/Verterra%20Solar%20-%20Phase%20II%20Presentation.pdf?7fcb75&d7f070&d7f070